Monday 3rd August 2020

Resource Clips


Posts tagged ‘triuranium octoxide’

Athabasca Basin and beyond

June 28th, 2014

Uranium news from Saskatchewan and elsewhere for June 21 to 27, 2014

by Greg Klein

Next Page 1 | 2

Fission about to start $12-million summer program, targets December resource

Apparently hoping to get something really big for Christmas, Fission Uranium TSXV:FCU has yet more delineation drilling planned for Patterson Lake South this summer. Some 63 holes totalling about 20,330 metres are scheduled to start imminently, with 43 closely spaced holes sunk from barges over the lake. The campaign calls for up to four rigs to help produce a maiden resource for December. The focus is R780E, which merged with three other zones last winter to become by far the biggest of five PLS zones along a 2.24-kilometre potential strike.

Uranium news from Saskatchewan and elsewhere for June 21 to 27, 2014

Twenty holes will test electromagnetic conductors prioritized by geophysical and radon-in-water surveys. Fission stated its 31,039-hectare property “remains highly prospective for several kilometres both in the immediate area of known mineralization and along strike in both the WSW and ENE directions.”

The company also plans metallurgical and petrographic studies “to evaluate important characteristics of uranium recovery and rock characteristics, including work on gold recovery.” Back in June 2013 the former Fission Energy/Alpha Minerals joint venture reported gold results from PLS.

A batch of assays released June 16 left 48 holes to report from last winter’s 92. Was that number a fluke?

Lakeland Resources expands exploration prospects with another Athabasca Basin acquisition

With the Fond du Lac project announced June 25, the Lakeland Resources TSXV:LK portfolio now totals 17 properties in and around the Athabasca Basin. The 2,827-hectare newcomer straddles the rim of the northeastern Basin in the vicinity of the company’s Small Lake, Karen Lake and Hidden Bay properties.

Featuring relatively shallow depth to the unconformity, Fond du Lac underwent regional airborne and geochemical surveys, ground EM, magnetic and gravity surveys, and one drill hole by 1984. More recent work confirmed a conductive target and roughly coincident uranium and pathfinder element geochemical anomalies.

“Over the last 30 years there’s been a lot of improvement in how you assess these properties,” corporate communications manager Roger Leschuk tells ResourceClips.com. “Back in the ’70s and ’80s they worked to the best of their knowledge and technology of the time. Now people like Neil McCallum and Jody Dahrouge [of Dahrouge Geological Consulting] can come along and look at it in a different light. So the historic data is just a starting point.”

Subject to TSXV approval, Lakeland gets the 100% interest by issuing 200,000 shares to Anthem Resources TSXV:AYN, which retains a 1.5% NSR.

“The property comes with a $50,000 work commitment by year-end, but we’ll likely spend more on a program that would include a radon survey and boulder-sampling,” Leschuk says. “We want to get it to the drill-ready stage.”

We’re well-financed, we have more cash than we had a year ago and we intend to continue advancing our projects and looking for good partners. We have a busy summer ahead with more news coming.—Roger Leschuk, corporate
communications manager
for Lakeland Resources

Lakeland’s 17 properties now cover 164,316 hectares. In April the company expanded its Lazy Edward Bay project. Two weeks before that Lakeland picked up five other acquisitions. Gibbon’s Creek, the company’s joint venture with Declan Resources TSXV:LAN, has shown surface boulders grading up to 4.28% U3O8 and some of the Basin’s highest radon readings.

“We’re well-financed, we have more cash than we had a year ago and we intend to continue advancing our projects and looking for good partners,” Leschuk adds. “We have a busy summer ahead with more news coming.”

Lakeland also announced its May 30 trading debut on the OTCQX under the symbol LRESF. “The OTCQX is a highly visible trading platform that has emerged as the world’s leading, premier cross-listing venture for international issuers that wish to benefit from U.S. trading and investor demand without diluting their current shareholder base,” the company stated.

Paladin boosts Michelin M&I to 84.1 million pounds U3O8

Although low uranium prices have forced Paladin Energy TSX:PDN to cut back on production, the company continues to build resources for the future. On June 26 Paladin released a substantial upgrade to its Michelin deposit in Labrador, boasting a 25% increase to the measured and indicated categories. The open pit portion uses a cutoff of 0.025% U3O8 to show:

  • measured:10.46 million tonnes averaging 0.0938% for 21.63 million pounds U3O8

  • indicated:5.93 million tonnes averaging 0.0937% for 12.26 million pounds

  • measured and indicated:16.4 million tonnes averaging 0.0938% for 33.89 million pounds

  • inferred:1.64 million tonnes averaging 0.1343% for 4.86 million pounds

Beginning 230 metres below surface, the underground portion uses a 0.05% cutoff to show:

  • measured:5.11 million tonnes averaging 0.1104% for 12.45 million pounds

  • indicated:16 million tonnes averaging 0.1072% for 37.8 million pounds

  • measured and indicated:21.11 million tonnes averaging 0.108% for 50.24 million pounds

  • inferred:7.17 million tonnes averaging 0.114% for 18.02 million pounds

Next Page 1 | 2

Acquisition expands Lakeland Resources’ search for Athabasca Basin uranium

June 25th, 2014

by Greg Klein | June 25, 2014

Acquisition expands Lakeland Resources’ search for Athabasca Basin uranium

With 17 properties totalling 164,316 hectares,
Lakeland Resources looks forward to a busy summer of exploration.

 

An additional property now gives the acquisitive Lakeland Resources TSXV:LK a portfolio of 17 uranium prospects in and around Saskatchewan’s Athabasca Basin. Announced June 25, the 2,827-hectare Fond du Lac project straddles the northeastern Basin’s margin in the vicinity of the company’s Small Lake, Karen Lake and Hidden Bay properties.

With relatively shallow depth to the unconformity, Fond du Lac underwent regional airborne and geochemical surveys, ground electromagnetics, magnetic and gravity surveys and one drill hole by 1984. More recent work confirmed a conductive target and roughly coincident uranium and pathfinder element geochemical anomalies.

“Over the last 30 years there’s been a lot of improvement in how you assess these properties,” corporate communications manager Roger Leschuk tells ResourceClips.com. “Back in the ’70s and ’80s they worked to the best of their knowledge and technology of the time. Now people like Neil McCallum and Jody Dahrouge [of Dahrouge Geological Consulting] can come along and look at it in a different light. So the historic data is just a starting point.”

Subject to TSXV approval, Lakeland gets the 100% interest by issuing 200,000 shares to Anthem Resources TSXV:AYN, which retains a 1.5% NSR.

“The property comes with a $50,000 work commitment by year-end, but we’ll likely spend more on a program that would include a radon survey and boulder-sampling,” says Leschuk. “We want to get it to the drill-ready stage.”

Lakeland’s 17-property portfolio totals 164,316 hectares. In April the company expanded its Lazy Edward Bay project, an act preceded by five other acquisitions two weeks earlier. Gibbon’s Creek, the company’s joint venture with Declan Resources TSXV:LAN, has shown surface boulders grading up to 4.28% U3O8 and some of the Basin’s highest radon readings.

“We’re well-financed, we have more cash than we had a year ago and we intend to continue advancing our projects and looking for good partners,” Leschuk adds. “We have a busy summer ahead with more news coming.”

Lakeland also announced its May 30 trading debut on the OTCQX under the symbol LRESF. “The OTCQX is a highly visible trading platform that has emerged as the world’s leading, premier cross-listing venture for international issuers that wish to benefit from U.S. trading and investor demand without diluting their current shareholder base,” the company stated.

Disclaimer: Lakeland Resources Inc is a client of OnPage Media Corp, the publisher of ResourceClips.com. The principals of OnPage Media may hold shares in Lakeland Resources.

Athabasca Basin and beyond

June 21st, 2014

Uranium news from Saskatchewan and elsewhere for June 14 to 20, 2014

by Greg Klein

Next Page 1 | 2

Patterson Lake South gives Fission 91 metres of 4.29% U3O8

High grades and shallow depths continue to characterize Fission Uranium’s (TSXV:FCU) Patterson Lake South. A June 16 batch of assays found positive results from three holes targeting the eastern part of R780E, the middle of five zones along a 2.24-kilometre potential strike. The two best holes showed:

Hole PLS14-161

  • 0.11% uranium oxide (U3O8) over 13 metres, starting at 137 metres in downhole depth
Uranium news from Saskatchewan and elsewhere for June 14 to 20, 2014

  • 0.2% over 22 metres, starting at 153 metres

  • 1.88% over 3.5 metres, starting at 190.5 metres

  • 2.48% over 4.5 metres, starting at 209.5 metres

  • 7.85% over 3 metres, starting at 221.5 metres
  • (including 18.1% over 1 metre)

Hole PLS14-164

  • 4.29% over 91 metres, starting at 97 metres
  • (including 14.69% over 6.5 metres)
  • (and including 21.2% over 7 metres)

  • 3.5% over 2.5 metres, starting at 228 metres

True widths weren’t provided. Another hole testing the gap between R780E and discovery zone R00E to the west failed to find significant mineralization.

The results followed a late May batch that featured 4.44% U3O8 over 38 metres. The tally from last winter’s campaign now stands at 44 holes reported and 48 pending.

With still no word on a maiden resource, another question remains outstanding: When will someone find the source of the uraniferous boulder field that inspired so much successful drilling since November 2012?

Denison boosts Wheeler River to 70 million pounds indicated, drills Gryphon zone

Denison Mines TSX:DML reported a 34% increase for the indicated category of the Phoenix zone on its Wheeler River joint venture June 17. The resource uses a 0.8% cutoff to estimate:

  • indicated: 166,400 tonnes averaging 19.13% for 70.2 million pounds U3O8

  • inferred:8,600 tonnes averaging 5.8% for 1.1 million pounds
Denison boosts Wheeler River’s Phoenix resource, drills Gryphon zone

A substantial upgrade to the Phoenix resource now complete,
Denison turns its focus to Wheeler River’s Gryphon zone.

With a 60% interest in Wheeler River, project operator Denison’s share comes to 42.1 million pounds indicated and 600,000 pounds inferred. Cameco Corp TSX:CCO holds a 30% interest while JCU (Canada) Exploration holds the rest.

The estimate was based on 25 new holes in addition to the 2012 resource. With mineralization at 400 metres in depth and varying from disseminated to massive, “Phoenix belongs to a select group of very high-grade unconformity uranium deposits that includes the prolific McArthur River mine (37 kilometres to the northeast) and the Cigar Lake mine (80 kilometres to the northeast),” Denison stated.

JV partner Cameco operates the Key Lake mill about 35 kilometres northeast of Wheeler.

The Phoenix upgrade notwithstanding, Wheeler’s newly discovered Gryphon zone has taken centre stage. Now underway is a two-drill, 18-hole, 14,000-metre summer program three kilometres northwest of Phoenix. Meanwhile Denison has a 3D DC-resistivity survey planned for the northern extension of the Phoenix trend.

The previous week Denison closed its most recent company acquisition, of International Enexco. With $15 million committed to Canadian exploration in 2014, Denison announced its summer plans earlier this month.

Aldrin’s first three Anticline holes at Triple M reveal radioactivity

Aldrin Resource TSXV:ALN reported more radioactive mineralization from the Anticline target on its PLS-adjacent Triple M property June 19. Results for the first three holes showed significant intervals above 300 counts per second for widths above 0.3 metres as measured by a downhole radiometric probe.

Hole ALN14-008 had been reported in late May but further drilling found additional radioactivity in small intervals ranging from 0.4 metres to 6.5 metres (not true thicknesses) of mineralization between downhole depths of 176.6 and 323.9 metres.

ALN14-009 showed radioactivity in several small intercepts between 214.9 and 289.1 metres in depth, while ALN14-010 revealed intervals between 226.7 and 282 metres.

The company cautioned that radiometric results could indicate potassium or thorium. Aldrin describes the Anticline target as “a coincident basement conductor, gravity low and structural feature extending more than 2.5 kilometres on strike.” These three holes tested its northeast corner.

Drilling will resume “immediately following our high-resolution surface geophysics and geochemistry,” CEO Johnathan More stated.

In April the company released initial results from four of seven holes on Triple M’s Forrest Lake fault. The 12,000-hectare project comprises two blocks west and south of PLS.

Fission 3.0, Azincourt to begin summer drilling at Patterson Lake North

Adjacent and to the north of PLS, Patterson Lake North has four or five holes totalling about 1,600 metres that were expected to begin imminently, according to June 16 announcements from Fission 3.0 TSXV:FUU and Azincourt Uranium TSXV:AAZ. The plan is to test the project’s A1 and A4 conductors with three holes spaced 400 metres apart and a fourth contingent on the first three results. Winter drilling failed to find radioactivity but did “confirm the high prospectivity of the target areas,” the companies stated last April.

This summer’s budget comes to $1.5 million, including geophysics. Fission 3.0 acts as operator on the 27,408-hectare property, where Azincourt has just entered year two of a 50% earn-in.

Late last month Azincourt and Macusani Yellowcake TSXV:YEL stated they would extend to June 15 a letter of intent to consolidate their Peruvian assets. That date passed without further announcement.

The Fission 3.0 portfolio also includes a Peruvian interest in addition to nine others in Saskatchewan and Alberta. Late last month the company joined Brades Resource TSXV:BRA to announce VTEM results from their Clearwater West joint venture.

Next Page 1 | 2

Denison boosts Wheeler River’s Phoenix resource, drills Gryphon zone

June 17th, 2014

This story has been moved here.

Athabasca Basin and beyond

June 14th, 2014

Uranium news from Saskatchewan and elsewhere for June 7 to 13, 2014

by Greg Klein

Next Page 1 | 2

Strateco turns to Saskatchewan while Quebec uranium inquiry comes under fire

For the $123 million spent on it so far, the project has a resource showing 7.78 million pounds U3O8 indicated and 19.22 million pounds inferred. It also has an underground exploration permit issued by the Canadian Nuclear Safety Commission. But Quebec’s moratorium on uranium activity has finally caused Strateco Resources TSX:RSC to shut down its Matoush camp in the province’s Otish Basin. Now with a $1.4-million financing that the company hopes will save its TSX listing, Strateco’s focusing on a Saskatchewan project acquired from Denison Mines TSX:DML.

Strateco turns to Saskatchewan while Quebec uranium inquiry comes under fire

Now mothballed, Strateco’s Matoush project has a 2012 resource
showing 7.78 million pounds U3O8 indicated and
19.22 million pounds inferred.

In a June 12 announcement, Strateco attributed Matoush’s cost-cutting closure to Quebec’s refusal to issue an exploration permit. Some of the project’s facilities and equipment have been sold. The company has already launched legal action over the permit refusal.

Strateco also closed a private placement to try to prevent a TSX delisting. The company raised $1.4 million from Sentient Executive GP IV, an insider.

Meanwhile a Strateco subsidiary, SeqUr Exploration Inc, issued just under 15 million Strateco shares to take on the Jasper Lake package, a 60% option on four eastern Athabasca properties totalling 45,271 hectares that Strateco negotiated with Denison late last year. SeqUr also closed a $100,000 private placement with Sentient. The subsidiary plans exploration “in the coming months.”

Two days before the Strateco announcements a Quebec inquiry into uranium mining and exploration was challenged again, this time by a group of 70 “scientists and professionals from industry and academia.” In an open letter distributed June 10, the group questioned the inquiry chairperson’s neutrality as well as the utility of the proceedings.

Quebec’s environmental watchdog, le Bureau d’audiences publiques sur l’environnement (BAPE), began hearings last month in a process expected to last 12 to 18 months. Until a decision is made whether to allow uranium activity, the moratorium imposed in March 2013 remains in effect. But Labrador, Greenland and Queensland have “recently lifted moratoria that they now perceive as unjustified,” the group maintained.

Calling Louis-Gilles Francoeur’s appointment as chairperson “perplexing,” the open letter stated, “Throughout his career, Mr. Francoeur has tended to echo uranium industry critics. The BAPE is an institution founded on the principle of absolute neutrality. What would become of the BAPE’s credibility if a former mining executive were appointed chairman of the commission?”

Francoeur was selected during the province’s previous Parti Quebecois government.

“Exploration for and development of any mineral, including uranium, cannot go against the public interest,” the group pointed out. But, the signatories argued, “We are heading into a process that was borne of uranium fear-mongering fuelled by an archaic and biased view of the mining industry.” They questioned whether the hearings, with a price tag they peg at over $2 million, “should even be held.”

Quoting November 2013 poll numbers, the group said Saskatchewan’s uranium industry has the support of about 80% of the population, “including 76% of people in the communities and reserves of northern Saskatchewan, where the uranium mines are found.”

The group also noted some environmentalists support nuclear energy, as indicated by “the latest report of the Intergovernmental Panel on Climate Change, an organization established by the United Nations Environment Programme and free from suspicion of complicity with industry.”

The 70 concluded that the industry already faces strict regulations. “It is impossible for any uranium deposit to be developed, and then mined, without the project meeting the most stringent standards and being subject to public hearings,” they stated. “The Canadian Nuclear Safety Commission (CNSC), a globally recognized agency with no ties to industry, sets the standards and has permanent monitoring and, if needed, enforcement powers over all nuclear industry activities.”

The communique follows a similar challenge last month by the Quebec Mineral Exploration Association. The organization called for Francoeur to be replaced, describing his previous statements on the subject as “prejudicial and non-scientific.” A coalition of Quebec natives, doctors and environmentalists, however, have argued for an outright ban on the industry.

Last month Strateco, which has previously stated its intention to take part in the BAPE inquiry, threatened legal action should Quebec not replace Francoeur.

Denison closes acquisition of International Enexco

Its takeover by Denison complete, International Enexco delisted on June 10. Expansionist Denison now holds former Enexco assets in the eastern Athabasca Basin consisting of a 30% interest in Mann Lake and an additional 20% in Bachman Lake, giving Denison full control over the latter project. The company now shares the Mann Lake joint venture with Cameco Corp TSX:CCO (52.5%) and AREVA Resources Canada (17.5%).

A spinco gets Enexco’s U.S. non-uranium properties including the Contact copper project, which approaches pre-feasibility in Nevada.

The transaction went through without the public acrimony that initially ensued when Denison snatched Rockgate Capital from its proposed merger with Mega Uranium TSX:MGA late last year. At the time, Denison stated its intention to spin out its foreign assets and concentrate on the Athabasca Basin.

Next Page 1 | 2

Quebec uranium inquiry attacked by 70 geologists and engineers

June 10th, 2014

by Greg Klein | June 10, 2014

Quebec uranium inquiry attacked by 70 geos and engineers

Now stalled by Quebec’s moratorium on uranium, Strateco’s Matoush project has a January 2012
resource estimate of 7.78 million pounds U3O8 indicated and 19.22 million pounds inferred.

 

This story has been updated and moved here.

Athabasca Basin and beyond

June 7th, 2014

Uranium news from Saskatchewan and elsewhere for May 31 to June 6, 2014

by Greg Klein

Next Page 1 | 2

NexGen assays improve on radiometric results from Rook 1’s Arrow

Where previous radiometric results found uranium mineralization in seven of eight holes, the Arrow zone at NexGen Energy’s (TSXV:NXE) Rook 1 project now shows mineralization in all eight, according to assays released June 2. The company interprets the results to reveal “multiple parallel, steeply dipping, high-grade uranium mineralization zones within broader mineralized zones” and “continuity of uranium mineralization between holes.” The best results include:

Hole RK-14-30

  • 2.94% uranium oxide (U3O8) over 6.2 metres, starting at 475 metres in downhole depth
  • (including 5.81% over 2.6 metres)
Uranium news from Saskatchewan and elsewhere for May 31 to June 6, 2014

  • 2.51% over 10 metres, starting at 508 metres
  • (including 5.84% over 0.5 metres)
  • (and including 10.26% over 1.7 metres)

  • 1.51% over 4.9 metres, starting at 549.4 metres
  • (including 12.5% over 0.4 metres)

  • 1.61% over 8.4 metres, starting at 570.6 metres
  • (including 8.57% over 0.25 metres)
  • (and including 11.6% over 0.35 metres)
  • (and including 5.1% over 0.3 metres)

Hole RK-14-27

  • 1.04% over 29 metres, starting at 235 metres
  • (including 23.5% over 0.4 metres)
  • (and including 9.42% over 1.1 metres)

Hole RK-14-21

  • 0.37% over 5.75 metres, starting at 517.25 metres
  • (including 5.77% over 0.25 metres)

True widths weren’t provided.

Some of the intercepts showed “very minor” intervals of elevated copper and lead but “potentially deleterious elements such as arsenic, selenium, cadmium and mercury generally constitute only background levels,” NexGen stated. “Arrow is essentially a mono-mineralic uranium deposit without noticeable deleterious metals or waste.”

Winter drilling at Rook 1 consisted of 17 holes totalling 7,442 metres but February’s Arrow discovery suddenly shifted focus to the new area. Arrow’s potential strike currently reaches about 215 metres, open in all directions and at depth, NexGen has stated. More drilling’s planned for summer on the property adjacently east of Fission Uranium’s (TSXV:FCU) Patterson Lake South.

Denison releases two high-grade Wheeler River assays, outlines summer plans

Also improving on previous radiometric results—and not for the first time at that project—Denison Mines TSX:DML released assays for two holes at Wheeler River’s new Gryphon zone on June 3:

Hole WR-556

  • 15.3% U3O8 over 4 metres, starting at 697.5 metres in downhole depth

Hole WR-560

  • 21.2% over 4.5 metres, starting at 759 metres

True widths were estimated at about 75%. The zone remains open in both strike directions and at depth, Denison stated.

In April the company released a batch of high-grade assays from Zone A of Wheeler’s Phoenix deposit, three kilometres southeast of Gryphon. A Phoenix resource is expected this month. But summer drilling will concentrate on Gryphon, which is slated for an 18-hole, 14,000-metre program. “Most of the drilling will consist of 50-metre step-outs along strike and down dip of the new discovery,” Denison stated. “Some of the holes will also complete drill fences 800 metres along strike to the northeast and southwest of Gryphon.” Work begins in mid-June.

With a 60% interest in the project, Denison acts as operator. Cameco Corp TSX:CCO holds 30% while JCU (Canada) Exploration holds the remainder.

Drills will also turn at three other Denison interests this summer. Crawford Lake and Bachman Lake, two more Denison-operated projects, get follow-up work on alteration zones found last year and on anomalies revealed by last winter’s geophysics. Denison holds 100% of Crawford and 80% of Bachman, where International Enexco TSXV:IEC holds the rest.

On June 4 Enexco security holders approved their company’s takeover by Denison.

Exploration drilling at the McClean Lake project will test geophysical anomalies near the McClean South deposit. McClean Lake is held 22.5% by Denison, 70% by project operator AREVA Resources Canada and 7.5% by OURD Canada. In all, the four properties get about 21,000 metres of drilling.

Additionally, Denison has geophysics planned for five properties.

Last month the company announced a $15-million budget for Canadian exploration focusing on the eastern Athabasca Basin.

UEX reports drill results from Laurie and Mirror River JV

UEX Corp TSX:UEX announced drill results from its Laurie and Mirror River projects on June 5. Joint venture partner AREVA Resources Canada acts as operator on both, located about 35 and 55 kilometres respectively east of PLS.

Five holes totalling 1,803 metres at Laurie failed to find significant radioactivity or geochemical values. But they did confirm existence of three conductors at the unconformity and found a large fault zone which will be tested for possible up-dip continuation at the unconformity.

Nor was significant radioactivity encountered in three Mirror River holes totalling 1,579 metres, although one of two conductors was confirmed.

However the projects “remain vastly underexplored and have extensive untested EM conductors that warrant additional drilling,” UEX stated.

Another western Basin project, Erica now undergoes a ground tensor magneto-telluric survey to further examine a conductive trend found by previous geophysics.

All three projects are part of a seven-property, 116,137-hectare western Basin JV package held 49.1%/50.9% by UEX and AREVA Resources Canada. Major UEX projects consist of Shea Creek and Hidden Bay, the former also held 49.1%/50.9% with AREVA, the latter held 100% by UEX. In April the company reported six holes from Black Lake, a JV with Uracan Resources TSXV:URC.

On June 6 UEX announced shareholders re-elected their board and approved management resolutions.

Pistol Bay announces winter drill results from C-5

On June 4 Pistol Bay Mining TSXV:PST released assays for two of six holes from last winter’s 3,344-metre campaign at the C-5 property, where Rio Tinto Canada Uranium Corp acts as operator. Results for hole 14CBK003 showed:

  • 0.054% U3O8 over 1.5 metres, starting at 366 metres in downhole depth
  • (including 0.071% over 0.5 metres)

Located 50 metres northeast and along strike, 14CBK005 showed:

  • 0.041% over 0.32 metres, starting at 379.82 metres

  • 0.022% over 1 metre, starting at 385 metres

True widths weren’t provided. Due to high core loss, assays for 14CBK003 “are not considered truly reflective of the mineralization,” Pistol Bay stated.

The C-4, C-5 and C-6 properties comprise a JV with Rio covering 1,624 hectares adjoining the Denison/Cameco/JCU Wheeler River project. Rio has earned 55% by paying Pistol Bay $147,000 and spending $1 million on exploration so far. The mining giant’s subsidiary may increase its stake to 75% by spending another $1 million by year-end.

Pistol Bay also holds interests in copper-gold properties contiguous with Colorado Resources’ (TSXV:CXO) North ROK discovery and Imperial Metals’ (TSX:III) Red Chris mine in British Columbia, and in a graphite property in Ontario.

Next Page 1 | 2

Garrett Ainsworth leaves Alpha for NexGen, Alpha considers legal action against both

June 3rd, 2014

This story has been moved here.

Athabasca Basin and beyond

May 31st, 2014

Uranium news from Saskatchewan and elsewhere for May 24 to 30, 2014

by Greg Klein

Next Page 1 | 2

Fission Uranium drills 38 metres of 4.44% U3O8 at Patterson Lake South

Still no word on a resource estimate, but Fission Uranium TSXV:FCU released assays for 10 more infill holes from Patterson Lake South on May 29. The latest batch brings the total reported holes from last winter to 40, with 52 more to come. Nine of the most recent came from R780E, the middle and the largest of five zones along a 2.24-kilometre potential strike that’s open to the east and west. Some of the best results show:

Hole PLS14-153

  • 0.34% uranium oxide (U3O8) over 21.5 metres, starting at 166.5 metres in downhole depth
  • (including 1.47% over 2 metres)
Uranium news from Saskatchewan and elsewhere for May 24 to 30, 2014

  • 0.78% over 5.5 metres, starting at 203 metres
  • (including 3.76% over 1 metre)

  • 0.64% over 10.5 metres, starting at 215 metres
  • (including 4.16% over 1 metre)

Hole PLS14-156

  • 4.68% over 19 metres, starting at 103.5 metres
  • (including 12.32% over 5.5 metres)

  • 3.69% over 4.5 metres, starting at 202 metres
  • (including 10.67% over 1.5 metres)

Hole PLS14-160

  • 4.44% over 38 metres, starting at 69 metres
  • (including 14.74% over 10 metres)

  • 1.05% over 9.5 metres, starting at 187 metres
  • (including 3.44% over 2.5 metres)

Hole PLS14-167

  • 1.16% over 18.5 metres, starting at 120 metres
  • (including 3.1% over 6.5 metres)

Hole PLS14-171

  • 1.05% over 18.5 metres, starting at 75 metres
  • (including 4.42% over 2.5 metres)

  • 2.96% over 48 metres, starting at 105 metres
  • (including 8.67% over 11.5 metres)

Fission Uranium also released one assay from R00E, the second zone from the west and location of the project’s first hit.

Hole PLS14-163

  • 0.14% over 5 metres, starting at 128.5 metres

True widths weren’t provided.

Back to the R780E assays, Fission Uranium stated they show “the exceptional strength of uranium mineralization in the middle region over a substantial strike length” of the zone.

Aldrin finds radioactivity at Triple M’s Anticline area

The first hole sunk on the Anticline target at Aldrin Resource’s (TSXV:ALN) Triple M property went radioactive, the company announced May 29. A downhole probe found nine intervals totalling 14.6 metres (not true widths) showing “significant” radiation above 300 counts per second for intercepts above 0.3 metres. The nine intervals occurred at downhole depths between 176.6 and 246.2 metres.

Radiation measurements are no substitute for assays. The company noted that radiation could come from potassium or thorium, but radiometric readings have shown some correlation with uranium at the adjacent PLS project.

Aldrin has also drilled seven holes so far on the project’s Forrest Lake fault, reporting preliminary results for the first four in April. The 12,000-hectare Triple M property consists of two blocks west and south of PLS.

Ur-Energy reports Shirley Basin eU3O8, prepares 43-101

Radiometric results announced May 28 follow completion of a 14-hole confirmation drill program at Ur-Energy’s (TSX:URE) Shirley Basin project in Wyoming. Providing the results not as counts per second but as uranium oxide-equivalent, the company found 13 intercepts above 0.02% eU3O8 for intercepts ranging between 1.83 metres and 5.79 metres thick (not true widths). The intercepts started at downhole depths ranging from 68 to 161 metres.

Historically, the Shirley Basin district has hosted low-grade deposits suited to in-situ recovery operations. But this campaign found higher-grade results too, including:

  • 0.502% eU3O8 over 2.44 metres, starting at 95 metres in downhole depth

  • 0.321% over 3.81 metres, starting at 73.8 metres

  • 0.189% over 5.79 metres, starting at 100.95 metres

Now underway is a 43-101 technical report on the property, part of last December’s acquisition of Pathfinder Mines. In August Ur-Energy began ISR production at another Wyoming project, Lost Creek. In May the company revised the mine’s guidance in view of low uranium prices.

Fission 3.0 and Brades report Clearwater West conductors

On May 27 Fission 3.0 TSXV:FUU and Brades Resource TSXV:BRA announced more detailed results from a previously reported VTEM survey. The companies now say 24 conductive areas have been located on the Clearwater West joint venture, five coinciding with anomalous radiometric readings. In all, seven high-priority areas have been identified on the eastern side of the 11,835-hectare property that borders PLS to the north.

Follow-up work will include boulder prospecting and ground-based electromagnetic and DC resistivity surveys to determine drill targets.

The Fission Energy spinco acts as operator and currently holds 100% of the project. Brades has a three-year, 50% option that would call for $5 million in spending by October 2016 and a first-year commitment of $700,000.

New listing enhances Lakeland Resources’ American exposure

Lakeland Resources TSXV:LK made its OTCQX trading debut May 30, marking an important step “as we continue to grow and expand our shareholder base globally,” said president/CEO Jonathan Armes. “The United States is an important market to be active in and we look forward to the increased visibility and exposure that this new listing will offer.”

In April the company announced a 4,475-hectare expansion to its Lazy Edward Bay project, one of Lakeland’s 16 uranium properties in and around the Basin.

Read more about Lakeland Resources here and here.

Next Page 1 | 2

Athabasca Basin and beyond

May 24th, 2014

Uranium news from Saskatchewan and elsewhere for May 17 to 23, 2014

by Greg Klein

Next Page 1 | 2

Kivalliq signs LOI with Westham Resources on Saskatchewan Genesis property

Its flagship Angilak project in Nunavut holds Canada’s highest-grade uranium deposit outside the Athabasca Basin. Nevertheless Kivalliq Energy TSXV:KIV was drawn into Saskatchewan with last January’s acquisition of the 198,763-hectare Genesis project. Now the company plans to bring in Westham Resources TSXV:WHR.P as a funding partner.

Under a letter of intent announced May 21, the capital pool company could acquire an 85% interest in return for 20% of its issued and outstanding shares, $1 million in payments and $5 million in spending over four years. The exploration commitment would include $1 million by year-end and another $1.5 million by August 31, 2016. Kivalliq would act as project operator for at least two years. Kivalliq director Dale Wallster would join Westham’s board.

Uranium news from Saskatchewan and elsewhere for May 17 to 23, 2014

Among other conditions, Westham must raise a private placement of at least $2 million.

The property lies northeast of the Basin in the prospective Western Wollaston Tectonic Domain and “covers basement rocks known to host uranium mineralization,” the companies stated. Previous operators and government surveys “outlined over 30 uranium showings that include several uranium-bearing boulder trains.” Based on that data, Kivalliq has identified eight initial targets for geophysics, sediment sampling, soil sampling, mapping and prospecting to be completed by early autumn. The company hopes to follow with a “major” drill program early next year.

Last February Kivalliq reported results of ore-sorting and metallurgical tests from Angilak’s Lac 50 deposit.

UEC adds one Texas property, “releases” another

Still expanding its southern Texas “hub-and-spoke” projects, Uranium Energy Corp NYSE MKT:UEC announced a new acquisition May 20, this one with a permitting advantage. The Longhorn project’s aquifer exemption “eliminates a major permitting hurdle” for a potential in-situ recovery operation, covering the mining zone of interest and allowing for expansion, the company stated. The project’s historic legacy includes drill maps and over 500 logs of gamma radiation data.

UEC compiled the project leases and data “over the last 18 months at a very low cost.”

The company also announced a decision to “release” its Channen project following evaluation of last summer’s drill results.

In April UEC completed a preliminary economic assessment for its Slick Rock uranium-vanadium deposit in Colorado. A week before that, the company announced its Burke Hollow ISR project in Texas had begun permitting.

UEC’s southern Texas holdings include the Hobson processing plant, the Palangana ISR mine, the Goliad development project and satellite properties. Of its nearly two dozen exploration properties, two are located in Paraguay and the others in the western U.S.

Unity picks up historic Uranium City region property

Twenty-six kilometres southwest of Uranium City, Saskatchewan, the Gulch Mine project comprises Unity Energy’s TSXV:UTY latest acquisition. Announced May 21, the 3,010-hectare property holds an historic, non-43-101 “reserve,” estimated by one source at around 928,796 pounds uranium oxide (U3O8) and by another at 1.65 million pounds. Gulch adjoins properties held by Fission 3.0 TSXV:FUU, Red Rock Energy TSXV:RRK and CanAlaska Uranium TSXV:CVV.

A 100% interest will require $1.2 million in payments over 18 months from Unity, which must drill 3,000 metres within three years. The vendor retains a 2.5% gross overriding royalty. Unity may buy back two-fifths for $1.5 million, less any previous royalty payments.

Earlier this month Unity closed a 100% option on the 14,200-hectare Camsell project in the northwestern Basin. In April the company optioned out 50% of its Mitchell Lake project to Rio Grande Mining TSXV:RGV.

MPVC tests NW Manitoba for uranium, “young” uranium, radon and lead 210

As a rotary air blast drill arrived on site, MPVC Inc TSXV:UNO updated its Northwest Manitoba project on May 22. The RAB drill is intended to quickly test shallow targets found by geophysical, geochemical and prospecting work. Drilling will take place over the lake while ice persists.

Two holes of core drilling have failed to convince a gamma ray spectrometer that they contain significant uranium mineralization, MPVC conceded. But “samples of the core are now being tested for radon, ‘young’ uranium and lead 210 which, if present, could signal the presence of uranium mineralization at greater depths.”

The company also reported receiving a letter of support for its one-year drill permit application from the Northlands Denesuline First Nation.

In early May MPVC stated preliminary results from the project’s radon-in-water survey showed, “to the author’s knowledge,” readings second only to Fission Uranium’s (TSXV:FCU) Patterson Lake South.

Contract prices, spending cuts help Ur-Energy withstand uranium’s descent

While uranium sinks to eight-year lows, on May 22 Ur-Energy TSX:URE revised its guidance for this year and next. With mid- and long-term contracts in place, customers have committed to buy approximately 518,000 pounds U3O8 at an average of $51.10 a pound this year, for projected revenues approaching $26.5 million.

As for 2015, the company so far has commitments for 630,000 pounds at an average of $50.10, for projected revenues of $31 million. With spending controls as well as managed production, Ur-Energy expects “to maintain a positive cash position throughout 2014 and 2015.”

Although its processing facility has a nameplate capacity of two million pounds annually, the company plans to keep production tied to contract obligations in 2015 “unless the market demonstrates sustained price improvement.”

Ur-Energy began ISR mining at Lost Creek in Wyoming last August.

Next Page 1 | 2