Sunday 15th July 2018

Resource Clips



Pistol Bay Mining begins drilling its expanded zinc-copper-polymetallic Ontario VMS project

by Greg Klein | March 22, 2018

With about 3,500 metres planned, Pistol Bay Mining TSXV:PST has drilling now underway at northwestern Ontario’s VMS-rich Confederation Lake greenstone belt. Three holes of about 500 metres each will supply material from the project’s Arrow zone for preliminary metallurgical tests. From there the rig shifts roughly eight kilometres west to the Fredart zone, aka the Copperlode A zone.

Pistol Bay Mining resumes drilling at its expanded zinc-polymetallic Ontario VMS project

Last year the company released a 43-101 resource for Arrow that used a base case 3% zinc-equivalent cutoff for an inferred category showing:

  • 2.1 million tonnes averaging 5.78% zinc, 0.72% copper,19.5 g/t silver and 0.6 g/t gold, for a zinc-equivalent grade of 8.42%

Contained amounts come to:

  • 274 million pounds zinc, 34.3 million pounds copper, 1.33 million ounces silver and 41,000 ounces gold

Obviously overdue for renewed attention is Fredart. The zone has conflicting historic, non-43-101 estimates of 386,000 tonnes averaging 1.56% copper and 33.6 g/t silver, or 219,500 tonnes averaging 1.95% copper and 41.8 g/t silver.

A January option agreement expands Pistol Bay’s Confederation Lake package by 3,700 hectares, for a total of about 20,700 hectares. The new turf comprises part of last year’s VTEM-Plus survey, the area’s first state-of-the-art regional geophysics. Some of the available, non-43-101 past intercepts from the acquisition’s Wasp Lake trend include 2.96% zinc and 0.04% copper over 2.79 metres, as well as 1.12% zinc and 0.04% copper over 7.19 metres. The same trend showed a strong conductive response on the VTEM-Plus results, Pistol Bay reported.

Another positive geophysical response came from the acquisition’s Fly Lake zone, where historic, non-43-101 assays reached as high as 1.36% zinc and 0.17% copper over 11.5 metres, along with 1.51% zinc and 0.08% copper over 8.9 metres. The zone appears to remain open along strike and at depth, the company stated. Nine other geophysical anomalies, meanwhile, appear to lack previous drilling.

The January option follows 5,860 hectares of staking last September that covers multiple conductors and IP anomalies identified in the airborne survey, as well as parallel conductors or extensions of known conductors.

Last month the company announced an amended agreement with a Rio Tinto NYSE:RIO subsidiary which will increase its hold on the C4, C5 and C6 uranium properties in Saskatchewan from 75% to 100%. The deal will bring Pistol Bay $1 million.

In January the company also announced progress with its PB Blockchain subsidiary as it builds “a suite of blockchain products to address needs that are particular to the data management and security of mining/oil and gas companies.”

Read more about Pistol Bay Mining here and here.

Share |

View All: News Stories