Saturday 21st October 2017

Resource Clips



Far Resources drills wide intercepts of spodumene on Manitoba lithium project

by Greg Klein | October 11, 2017

Having finished field work that included the Zoro lithium project’s first modern drill program, Far Resources CSE:FAT reports wide intervals showing visual evidence of spodumene. Still to come are lab results from the 710-metre program, as well as from rock and soil samples taken from the property in Manitoba’s Snow Lake camp.

Far Resources drills wide intercepts of spodumene on Manitoba lithium project

The first modern drill program follows extensive sampling
and other field work on Far Resources’ Zoro lithium project.

Targeting Zoro’s pegmatite dyke 1, drilling revealed light green spodumene in widths of 40.5 metres, 39.8 metres, 23 metres, 19.8 metres and 7.5 metres. Additionally, the company’s waiting on assays for 60 rock samples taken from dykes 2, 3 and 4. Also pending are lab results for 410 soil samples collected from areas north and south along trend of all known dykes on the property.

Previous samples taken from historic trenches and pits on dykes 5 to 7 brought results as high as 3.87% Li2O. Earlier composite rock chip samples graded up to 6.35% for dyke 5.

Late last month the company added another 2,200 hectares to Zoro, extending the property towards Ashburton Ventures’ (TSXV:ABR) Thompson Brothers lithium project.

In December Far Resources shareholders will vote on a proposal to spin out the Winston gold project in New Mexico to a newly created company.

Share |

View All: News Stories