Thursday 21st September 2017

Resource Clips



Golden Dawn Minerals reports up to 246 g/t silver, 2.69 g/t gold over 3.71 metres at B.C.’s Greenwood camp

by Greg Klein | April 26, 2017

Once again confirming mineralization beyond the former May Mac mine’s #7 level, Golden Dawn Minerals TSXV:GOM boasts silver and gold 70 metres northwest, 20 metres above and up to 120 metres below the adit. Assays released April 26 follow a batch released in early March, part of 31 underground holes totalling 3,834 metres sunk since late last year to test the Skomac and parallel veins.

Golden Dawn Minerals reports assays from B.C.’s Greenwood camp

Located 15 kilometres from May Mac, Golden Dawn’s Greenwood
gravity-flotation mill has a 200-tpd capacity expandable to 400 tpd.

May Mac comprises one of several southern British Columbia past-producers that Golden Dawn hopes to resurrect, all within range of the company’s Greenwood mill. Golden Dawn has a 43-101 technical report underway on the entire portfolio, including an updated PEA for its Lexington and Golden Crown projects.

Some standout assays from May Mac’s current crop include:

Hole MU 17-12

  • 335 g/t silver, 7.53 g/t gold, 0.2% lead and 0.5% zinc over 0.46 metres, starting at 30.93 metres

MU 17-14

  • 252.6 g/t silver, 0.93 g/t gold, 9.9% lead, 4.3% zinc and 0.1% copper over 2.57 metres, starting at 105.92 metres
  • (including 494.5 g/t silver, 1.21 g/t gold, 19.6% lead, 8% zinc and 0.1% copper over 1.29 metres)

  • 49.5 g/t silver, 12.55 g/t gold, 1.4% lead, 2% zinc and 0.1% copper over 0.56 metres, starting at 129 metres

MU 17-16

  • 246 g/t silver, 2.69 g/t gold, 1.3% lead, 0.9% zinc and 0.1% copper over 3.71 metres, starting at 70.76 metres
  • (including 472 g/t silver, 4.42 g/t gold, 11.3% lead, 4.7% zinc and 0.1% copper over 0.35 metres)
  • (and including 911 g/t silver, 9.53 g/t gold, 1.1% lead, 1% zinc and 0.2% copper over 0.55 metres)

MU 17-21

  • 58.8 g/t silver, 16.17 g/t gold, 2.3% lead, 3.3% zinc and 0.1% copper over 0.56 metres, starting at 15.84 metres
  • (including 90.5 g/t silver, 23.7 g/t gold, 3.7% lead, 5.5% zinc and 0.1% copper over 0.31 metres)

True widths weren’t available.

Having transferred the rig from underground drill station #3 to #2, work continues before moving to station #1. Subject of focus are the Skomac, Rose and West veins in a campaign expected to finish next month.

Other May Mac work awaits permit approvals. One application concerns additional surface drilling northwest along strike of the mine, where the company sees potential for mineralization up to another kilometre on the Skomac and parallel structures. The company also seeks approval to extend the #7 level northwest for additional drilling and a bulk sample of up to 10,000 tonnes.

Metallurgical tests have taken place on a May Mac composite core sample, with additional tests of tailings now underway to support processing at the mill, 15 kilometres from the mine.

Also proximal to the mill is Golden Dawn’s Golden Crown property, which has an application pending for surface drilling up to 10,000 metres. The company has preparations underway for field work at the recent Kettle River acquisition, which hosts 70 showings including 29 historic mines.

Golden Dawn also plans to begin dewatering its Lexington mine once spring weather allows.

Along with the mill, the former May Mac, Golden Crown and Lexington mines constitute the focal points of Golden Dawn’s Greenwood portfolio. Given the infrastructure in place, the company might decide to undertake trial mining and processing without the de-risking of a feasibility study.

In February Golden Dawn received a US$4-million advance on a gold purchase agreement.

Share |

View All: News Stories