Saturday 22nd October 2016

Resource Clips

Azincourt and Fission Uranium update winter plans for Patterson Lake North

by Greg Klein | November 18, 2013

Joint venture partners Fission Uranium TSXV:FCU and Azincourt Uranium TSXV:AAZ updated their previously announced winter plans for Patterson Lake North on November 18. The program now includes a radon survey at Hodge Lake as well as further electromagnetic work and eight to 10 holes totalling 2,500 to 3,000 metres.

Initial results from a five-kilometre ground magnetotelluric survey over the northern part of an eight-kilometre VTEM conductive trend suggest it comprises a series of parallel west-dipping basement EM conductors, the JV stated. Further EM work will increase resolution and orient a resistivity survey scheduled for next summer. “Many structurally controlled high-grade uranium occurrences in the Athabasca Basin are related to hydrothermal alteration systems associated with basement EM conductors,” the companies emphasized. Drill targets will be refined by identifying an EM basement conductor with a resistivity low signature, especially when associated with a cross-cutting interpreted structural feature, the partners explained.

Diamond drilling is slated to begin in January, after the holes have been pre-collared with RC rigs.

Azincourt is earning a 50% interest in the 27,408-hectare project adjacent to Fission’s better known project, the Patterson Lake South JV with Alpha Minerals TSXV:AMW. Fission acts as operator on both projects.

See last week’s uranium news roundup.

Share |

View All: News Stories