Friday 30th September 2016

Resource Clips


Athabasca Basin and beyond

Uranium news from Saskatchewan and elsewhere for October 26 to November 1, 2013

by Greg Klein

Next Page 1 | 2

Alpha/Fission hit 5.98% U3O8 over 17.5 metres, including 19.51% over 5.5 metres

With so many scintillometer results announced already, assays for the same holes can be anti-climactic. But that’s the way Fission Uranium TSXV:FCU and Alpha Minerals TSXV:AMW have orchestrated their Patterson Lake South campaign, now giving observers a near sense of déjà vu. Assays from four holes announced October 29 add little to the news of August 8, although results from the lab are much more reliable than those from the hand-held radiation-detecting gizmo. The assays come from R00E, the farthest southwest of the project’s five zones.

Hole PLS13-074

  • 0.13% uranium oxide (U3O8) over 2.5 metres, starting at 65 metres in downhole depth

PLS13-076

  • 0.09% over 2 metres, starting at 178.5 metres

  • 0.08% over 1.5 metres, starting at 183 metres

  • 0.16% over 4.5 metres, starting at 186.5 metres

PLS13-077

  • 0.39% over 11.5 metres, starting at 59 metres

  • 0.13% over 15.5 metres, starting at 73 metres

PLS13-079

  • 5.98% over 17.5 metres, starting at 83 metres

  • (including 19.51% over 5 metres) (Update: On November 4 the JV partners corrected the intercept width from 5.5 metres to 5 metres.)

True widths were unavailable. Three of the holes were vertical, while 079 dipped at -75 degrees. That hole expands the zone’s high-grade southern area, the companies stated, while all four holes confirm R00E’s east-west strike at 165 metres. The zone remains open in all directions.

With the summer barge-based campaign complete, attention now turns to a land-based program west of R00E. Fission acts as project operator on the 50/50 joint venture until its acquisition of Alpha closes. Fission shareholders will vote on the deal’s spinout aspect on November 28.

(Update: On November 4 the JV announced a sixth PLS zone west of the discovery. Read more.)

Rio Tinto plans winter drilling at Purepoint’s Red Willow

Purepoint Uranium Group TSXV:PTU announced plans on October 29 by Rio Tinto Exploration Canada for 2,500 metres of drilling at Red Willow, a 25,612-hectare property on the Athabasca Basin’s eastern edge. Rio identified targets based on historic drill logs and more recent geophysical and geochemical work. The company built a 28-person camp last summer.

Depth to unconformity in the area varies from zero to 80 metres, Purepoint stated. The company says five major deposits—JEB, Midwest, Cigar Lake, McArthur River and Millennium—“are located along a NE to SW mine trend that extends through the Red Willow project.”

Rio has so far spent about $2.25 million out of a $5-million commitment to earn an initial 51% interest by December 31, 2015. The giant’s Canadian subsidiary may earn 80% by spending $22.5 million by the end of 2021.

In early October Purepoint announced a winter drill campaign for the Hook Lake JV held 21% by Purepoint and 39.5% each by Cameco Corp TSX:CCO and AREVA Resources Canada.

Strong Q3 financials surprise Cameco shareholders

Despite historic low uranium prices, Cameco came out with Q3 earnings far beyond the same period last year. In his October 29 statement, president/CEO Tim Gitzel attributed the success to a contracting strategy “providing us with higher average realized prices that are well above the current uranium spot price.”

Uranium news from Saskatchewan and elsewhere for October 26 to November 1, 2013

Rabbit Lake was one of three Cameco operations that received
10-year licence renewals the same week that the company
surprised investors with an especially strong quarterly report.

Adjusted net earnings for three months ending September 30 came to $208 million, a 324% increase over Q3 2012 or, at 53 cents a share, a 342% increase. Year-to-date figures came to $295 million (up 48%) and 75 cents a share (up 47%).

Gitzel added that Cameco’s “starting to see some of the cost benefits of the restructuring we undertook earlier” and plans to “take advantage of the opportunity we see in the long term.”

However the company’s statement noted “there have been some deferrals of future projects due to uranium prices insufficient to support new production. The deferrals will not directly impact the near-term market, but could have an effect on the longer term outlook for the uranium industry. Complicating the supply outlook further is the possibility of some projects, primarily driven by sovereign interests, moving forward despite market conditions.”

The company forecast strong long-term fundamentals, mostly to China which has “reaffirmed its substantial growth targets out to 2020 and indicated plans to pursue further growth out to 2030. Their growth is palpable as construction on two more reactors began during the third quarter, bringing the total under construction to 30.”

As for Cameco’s long-delayed Cigar Lake mine, the company’s sticking to its current plan of Q1 2014 production and Q2 milling.

But while junior exploration flourishes, especially in the Athabasca Basin, the major plans a 15% to 20% cut in exploration spending this year.

Three Cameco operations get 10-year licence renewals

Licences for Cameco’s Key Lake, McArthur River and Rabbit Lake operations have been renewed for 10 years, the Canadian Nuclear Safety Commission announced October 29. The CNSC granted the extensions after three days of public meetings that heard from the company, 27 interveners and CNSC staff. The commission agreed to Cameco’s request for 10-year renewals, twice the previous term.

MillenMin finds radioactive outcrops on east Basin properties, reports AGM results

MillenMin Ventures TSXV:MVM completed initial field work at two eastside Basin properties, the 2,759-hectare Highrock Lake NE and 1,648-hectare Smalley Lake W. Work included prospecting, outcrop mapping and examination of previously found mineralization, the company announced October 28.

Grab samples from radioactive outcrops on both properties have been sent for assays. MillenMin first announced its foray into uranium last May and has staked 11 claims totalling about 18,983 hectares in and around the Basin.

On October 31 the company reported AGM results with directors re-elected, auditors re-appointed and other business approved.

Declan options northeastern Alberta property

Southwest of the Basin’s Alberta extremity, Declan Resources TSXV:LAN has optioned the 50,000-hectare Firebag River property. Previous geophysical survey data “shows a complex pattern of magnetic lows and highs, truncated or offset in the northern part of the property by the Marguerite River Fault,” Declan stated on October 29. Exploration in 1977 “confirmed the presence of a southwest-oriented fault zone and a geochemical anomaly with 11 ppm cobalt in lake sediments atop this structure,” the company added.

The deal would have Declan paying $85,000, issuing five million shares over two years and spending $3 million over three years. The optioner retains a 2% NSR on metals and a 4% gross overriding royalty on non-metallic commodities.

In September Declan announced an option to acquire the Patterson Lake Northeast property. The company plans to engage Dahrouge Geological Consulting to explore its uranium properties.

Rockgate takeover offer: Denison softens conditions, extends deadline

Denison Mines TSX:DML advanced its attempted takeover of Rockgate Capital TSX:RGT by lowering the minimum tender condition from 90% to two-thirds of outstanding shares. In an October 30 statement Denison also extended the offer’s deadline again, this time to November 18, and dropped conditions related to staff retention and consulting agreements.

The same day Rockgate said insiders agreed not to exercise their options unless another company comes up with a better offer. Denison had requested a cease trade order on 11 million Rockgate options granted on September 30, which Denison termed “improper defensive tactics.” The British Columbia Securities Commission didn’t agree. But rather than risk Denison withdrawing its offer, Rockgate insiders “put the interests of the shareholders of Rockgate before their own personal interests and agreed to amend the terms of the options,” company president/CEO Karl Kottmeier said.

The tone of the companies’ statements has warmed considerably since Kottmeier labelled Denison’s offer an “unsolicited opportunistic hostile takeover bid.” Denison president/CEO Ron Hochstein thanked Kottmeier and the Rockgate board “for their contributions to allowing the offer to proceed towards a successful conclusion.”

Meanwhile Rockgate continues prefeasibility work on its flagship Falea uranium-silver-copper project in Mali.

Read how Denison’s offer defeated Rockgate’s proposed merger with Mega Uranium.

Read more about uranium merger-and-acquisition activity.

Lakeland Resources’ JV partner New Dimension to drill for gold

Lakeland Resources TSXV:LK announced on October 31 an imminent drill campaign of at least 1,800 metres by JV partner New Dimension Resources TSXV:NDR on the Midas gold property in north-central Ontario. Lakeland optioned the project to New Dimension in September in order to focus on Saskatchewan uranium exploration. But Lakeland will retain a 30% interest in Midas carried to an initial 43-101 resource estimate.

I’m excited that the project’s going to continue to be worked while we focus on uranium.—Jonathan Armes, president/CEO
of Lakeland Resources

“New Dimension is a great group to work with and the deal was easy to do,” Lakeland president/CEO Jonathan Armes tells ResourceClips.com. “I’m excited that the project’s going to continue to be worked while we focus on uranium. The onus is on them to explore that project and we share in any benefits that result.”

The previous week Lakeland closed a private placement for a total of $1,057,718 and announced the appointment of Basin veteran John Gingerich to the company’s advisory board. Field work continues on Lakeland’s Riou Lake uranium project.

Read more about Lakeland Resources.

Next Page 1 | 2

Pages: 1 2


Comments are closed.

Share | rss feed

View All: Feature Articles