Thursday 18th September 2014

Resource Clips


Athabasca Basin and beyond

Uranium news from Saskatchewan and elsewhere for September 14 to 20, 2013

by Greg Klein

Next Page 1 | 2

Fission and Alpha sign acquisition agreement, Denison challenges Mega for Rockgate

Another burst of merger and acquisition activity hit the markets last week. Joint September 18 statements from Fission Uranium TSXV:FCU and Alpha Minerals TSXV:AMW announced a definitive agreement for the former’s acquisition of the latter. The proposed Mega Uranium TSX:MGA/Rockgate Capital TSX:RGT merger, however, took a surprising turn with Denison Mines’ TSX:DML unsolicited pitch for Rockgate. Denison’s September 17 announcement claimed a 38% premium over Mega’s offer, based on the previous day’s closing prices.

Uranium news from Saskatchewan and elsewhere for September 14 to 20, 2013

In addition to taking a run at Rockgate, Denison filed a revised
43-101 report for six deposits on its Mutanga property in Zambia.

The Fission/Alpha rationale is to put their 50/50 joint venture under a single owner, creating a company solely focused on Patterson Lake South and presumably a more attractive takeover target. Their other properties would go to two newly created spincos. Should Denison’s offer succeed, the company would spin out its African assets along with Rockgate’s advanced-stage Mali project. That would leave Denison focused on the Athabasca Basin.

Read more about these proposals and other uranium M&A news.

(Update: On September 24 Rockgate terminated its proposed merger with Mega. Read more.)

PLS assay backlog grows as Fission/Alpha release more scintillometer results

Step-out drilling confirmed strong mineralization in Patterson Lake South’s newest zone, Alpha and Fission stated on September 16. The JV partners released scintillometer readings for two new holes on zone R945E, the fourth of four zones along a 1.02-kilometre southwest-northeast trend.

The hand-held device measures drill core gamma rays in counts per second, up to an off-scale reading above 9,999 cps. The results are no substitute for assays, which are pending.

Hole PLS13-092 was collared roughly 10 metres north of existing holes. It reached a total downhole depth of 377 metres, striking the basement unconformity at 59 metres without encountering sandstone. Some highlights include:

  • <300 to 1,400 cps over 3 metres, starting at 157.5 metres in downhole depth

  • <300 to >9,999 cps over 16 metres, starting at 163 metres

  • <300 to 1,800 cps over 11 metres, starting at 192.5 metres

  • 460 to 2,500 cps over 2.5 metres, starting at 238 metres

PLS13-096 was collared about 15 metres grid west of PLS-084, replacing it as the zone’s most southwesterly hole. It found no sandstone, hit the basement unconformity at 56.5 metres and stopped at 365 metres. Highlights include:

  • <300 to >9,999 cps over 42.5 metres, starting at 135.5 metres in downhole depth

  • 310 to >9,999 cps over 11.5 metres, starting at 185.5 metres

  • <300 to >9,999 cps over 10.5 metres, starting at 235.5 metres

  • <300 to >9,999 cps over 14.5 metres, starting at 249 metres

True widths weren’t available. The two holes were drilled at -88 and -89 degree angles respectively, making downhole depths close to vertical.

The $6.95-million program calls for 44 holes totalling 11,000 metres, along with geophysics. These results bring the summer’s drilling to 27 holes totalling 8,488 metres. So far just one of the holes has had lab assays released. Scintillometer readings have been reported for 18 holes this summer.

Denison files combined resources for Mutanga property in Zambia

Denison has filed a new NI 43-101 report to replace two previous reports for its Mutanga property in Zambia, the company announced on September 16. The New Mutanga Report follows an Ontario Securities Commission review of a resource filed in March 2012 for the property’s Dibwe East deposit. The OSC declared that report non-compliant because it didn’t include all resource estimates and material information for the property as a whole. Denison’s new report incorporates information covered in a 2009 report on the Mutanga and Dibwe deposits, as well as the 2012 info for Dibwe East.

Of the project’s six deposits, only Mutanga shows measured, indicated and inferred categories. Mutanga Extension, Mutanga East, Mutanga West, Dibwe and Dibwe East have inferred pounds only. Combined, the estimate shows:

  • a measured resource of 1.88 million tonnes averaging 0.048% for 2 million pounds uranium oxide (U3O8)

  • an indicated resource of 8.4 million tonnes averaging 0.031% for 5.8 million pounds

  • inferred resources totalling 65.2 million tonnes averaging 0.029% for 41.4 million pounds

The 457.3-square-kilometre property is about 200 kilometres south of the capital city of Lusaka, near the Zimbabwean border.

The previous week, Denison updated two Athabasca Basin projects with a new resource for Waterbury Lake and more high-grade assays from Wheeler River.

Lakeland Resources options gold project to focus on Athabasca uranium

Now a pure play uranium explorer, Lakeland Resources TSXV:LK optioned a north-central Ontario gold property to New Dimension Resources TSXV:NDR, the companies announced September 16. New Dimension may earn a 70% interest in the Midas project by paying $100,000, spending $1.2 million and issuing 1.5 million shares. New Dimension must spend $300,000 on exploration by December 31.

We’re maintaining our focus on uranium, yet we’re not giving away what could turn out to be a valuable asset in the end. In our view there’s no downside to our shareholders, only a potential upside.—Roger Leschuk, corporate communications manager for Lakeland Resources

The 2,112-hectare road-accessible property has already seen ground magnetics, induced polarization and 16 drill holes that partially defined two gold-bearing zones, with 14 holes showing gold mineralization. Among the assays was 5.92 grams per tonne gold over 4.7 metres, starting at 45.7 metres in depth and including 8.88 g/t over 2.6 metres.

“We get to maintain an interest in a property that looks very encouraging to say the least,” Lakeland corporate communications manager Roger Leschuk tells ResourceClips.com. “The people who are picking it up are a very good group and they see this as potentially becoming their flagship property. The great part about it for Lakeland is we retain a 30% interest all the way potentially to a new discovery. We’re maintaining our focus on uranium, yet we’re not giving away what could turn out to be a valuable asset in the end. In our view there’s no downside to our shareholders, only a potential upside.”

A fall drill program is expected to begin shortly, the companies stated.

Read more about Lakeland Resources.

Forum announces fall/winter plans for its PLS-adjacent Clearwater project

In a September 17 report, Forum Uranium TSXV:FDC updated its Clearwater project, which underwent ground radiometric prospecting, lake sediment geochemical surveys and soil radon surveys in late August and early September. The radon survey found anomalous zones immediately southwest of the adjacent PLS property, the company stated. Forum now plans further prospecting of radiometric anomalies, as well as an expanded radon survey to cover areas with electromagnetic conductors on strike with the PLS conductive trend. Autumn is scheduled for ground EM surveys and early winter for ground gravity work to identify drill targets for the 9,910-hectare property in late January.

One week earlier Forum said its private placement raised $2.59 million.

Next Page 1 | 2

Pages: 1 2


Comments are closed.

Share | rss feed

View All: Feature Articles