Tuesday 27th September 2016

Resource Clips



Marathon reports Nfld Gold Assays up to 2.36 g/t over 29.75m, 6.53 g/t over 15.3m

Resource Clips - essential news on junior gold mining and junior silver miningMarathon Gold Corp TSX:MOZ announced assays from its the Leprechaun Gold Deposit of its 100%-owned Valentine Lake Project in Newfoundland. Results include

4.04 grams per tonne gold over 4.5 metres
6.53 g/t over 15.3 metres
(including 51.04 g/t gold over 0.9 metres)
5.45 g/t gold over 4.5 metres
(including 15.7 g/t gold over 0.9 metres)
5.03 g/t gold over 10 metres
(including 31.21 g/t gold over 1 metre)
2.21 g/t gold over 5 metres
9.75 g/t gold over 5.1 metres
2.36 g/t gold over 29.75 metres
(including 46.5 g/t gold over 0.85 metres)

President/CEO Phillip Walford commented, “The results from this summer’s stepout drilling program have been very successful. These new results confirm that the Leprechaun Gold Deposit is extending to depth. The central part of the deposit continues to exhibit high-grade gold mineralization which provides us with further encouragement, as it demonstrates that this deposit has the potential to be mined on surface or underground.”

View Company Profile

Jennie Guay
Investor Relations
416.987.0714

by Kevin Michael Grace

Share |

View All: News Stories