Sunday 4th December 2016

Resource Clips



Marathon, Mountain Lake report Nfld Results up to 15.8 g/t Gold over 8m

Resource Clips - essential news on junior gold mining and junior silver miningMarathon Gold Corp TSX:MOZ in joint venture with Mountain Lake Resources Inc TSXV:MOA announced assays from their Valentine Lake Project in Newfoundland. Highlights include

15.8 g/t gold over 8 metres
(including 65.33 g/t over 1 metre)
8.06 g/t over 12 metres
(including 29.64 g/t over 1 metre)
22.05 g/t over 3 metres
(including 66.03 g/t over 1 metre)
9.07 g/t over 8 metres
(including 66.63 g/t over 1 metre)
0.64 g/t over 65 metres
(including 12.9 g/t over 1 metre)
6.97 g/t over 5 metres
(including 19.34 g/t over 1 metre)

Valentine Lake is a 50/50 joint venture with Marathon acting as project operator. Marathon President/CEO Phillip Walford said, “The Leprechaun Gold Deposit has continued to expand with our highly successful winter 2012 drilling program. The intersection of new, wide intervals of Main Zone-style mineralization in the J. Frank Zone confirms the continuity of the gold system operating along the highly prospective thrust fault, which extends for over 25 kilometres within the Valentine Lake property. Summer drilling has resumed and with three drills turning, steady news flow is expected.”

View Company Profile

Contact:
Marathon Gold Corp
Jennie Guay
IR Manager
416.987.0714

Mountain Lake Resources Inc
Greg Lytle
Corporate Communications
604.839.6946
866.285.5817

Read an interview with Marathon President/CEO Phillip Walford.

Read a feature story about Marathon Gold.

by Greg Klein

Share |

View All: News Stories