Wednesday 26th October 2016

Resource Clips

Marathon reports Newfoundland Gold Results as high as 13.81 g/t over 19m

Resource Clips - essential news on junior gold mining and junior silver miningMarathon Gold Corp TSX:MOZ in joint venture with Mountain Lake Resources TSXV:MOA announced results from their Leprechaun Gold Deposit in Valentine Lake, Newfoundland. Highlights include

13.81 g/t gold over 19 metres
(including 109.94 g/t over 2 metres)
7.23 g/t over 22 metres
(including 48.99 g/t over 2 metres)
9.19 g/t over 15 metres
(including 34.92 g/t over 2 metres)
3.93 g/t over 30 metres
(including 19.01 g/t over 5 metres)
4.05 g/t over 24 metres
(including 24.55 g/t over 2 metres)
2.78 g/t over 22 metres
(including 15.66 g/t over 2 metres)

The Valentine Lake Project, including the Leprechaun Gold Deposit, is a 50/50 joint venture with Marathon acting as project operator. Marathon President/CEO Phillip Walford remarked, “Building upon the previously announced drill results, these exciting new gold intercepts further confirm both the continuity of the gold system and the ongoing expansion of the Leprechaun Gold Deposit. As this year’s stepout drilling program progresses it is becoming increasingly clear that this is a sizeable deposit with more high-grade zones to be found.”

View Company Profile

Marathon Gold Corp
Jennie Guay
IR Manager

Mountain Lake Resources Inc
Greg Lytle
Communications Manager

by Greg Klein

Share |

View All: News Stories