Friday 9th December 2016

Resource Clips



Queenston reports Ontario Results as high as 42.2 g/t Gold, 0.14% Copper over 10m

Resource Clips - essential news on junior gold mining and junior silver miningQueenston Mining Inc TSX:QMI announced assays from its Upper Beaver Property in the Kirkland Lake Gold Camp of Ontario. Highlights include

42.2 g/t gold and 0.14% copper over 10 metres
(including 399 g/t gold over 1 metre)
28.5 g/t gold and 0.56% copper over 6 metres
(including 42.2 g/t gold and 0.76% copper over 4 metres)
5.78 g/t gold and 0.31% copper over 27 metres
(including 54.7 g/t gold over 1 metre)
4.05 g/t gold and 0.2% copper over 26 metres
(including 8.92 g/t gold and 0.24% copper over 10 metres)
2.49 g/t gold and 0.12% copper over 56 metres
(including 10.1 g/t gold over 11 metres)
2.26 g/t gold over 53 metres
(including 2.75 g/t gold and 0.1% copper over 11 metres)

President/CEO Charles Page commented, “The new drilling results support the addition of mineral resources closer to surface and the conversion of mineralization to higher confidence levels in the deeper portion of the deposit. The recent drilling continues to intersect and extend widespread gold and copper mineralization, capping the deposit with the exciting addition of a significant high-grade component. A preliminary economic assessment to build a stand-alone mine/mill complex at Upper Beaver will be reported this month based on the mineral resource completed in May 2011. A resource update to include drilling results from the entire 2011 program is scheduled in the third quarter.”

View Company Profile

Contact:
Charles E. Page
President/CEO
416.364.0001 x 224

Ann Gibbs-Baines
Investor Relations
416.627.8872

Andreas Curkovic
Investor Relations
416.577.9927

by Greg Klein

Share |

View All: News Stories