Sunday 4th December 2016

Resource Clips



St Andrew reports Ontario Gold Assays including 7.5 g/t over 16.1m

St Andrew Goldfields Ltd TSX:SAS announced results from its Taylor Project in the Timmins Mining District, Ontario. Assays include 4.24 g/t gold over 5.2 metres, 4.33 g/t over 5.9 metres (including 27.8 g/t over 0.5 metres), 7.5 g/t over 16.1 metres (including 16.17 g/t over 6.6 metres), 4.94 g/t over 11.3 metres (including 29.1 g/t over 1 metre), 3.82 g/t over 13.6 metres (including 33.29 g/t over 0.7 metres), 31.2 g/t over 1 metre, 10.51 g/t over 2.6 metres and 7.19 g/t over 1.6 metres.

President/CEO Jacques Perron said, “The drilling at Taylor continues to prove positive results in grade, intercept widths and continuity. These results solidify our confidence in the potential for the future development of the Taylor Project, which we will continue to drill during 2011. We currently have two drills focussed on infill drilling and testing the extensions of the zones at depth, with additional drills being added in the coming weeks.”

View Company Profile

Contact:
Jacques Perron
President/CEO
416.463.5139

or Suzette N. Ramcharan
Manager, Investor Relations
416.463.5139

by Ted Niles

Share |

View All: News Stories