Friday 21st October 2016

Resource Clips

Murgor reports Ontario Assays up to 2.56 g/t over 40m

Murgor Resources Inc TSXV:MGR announced results from its Golden Arrow Gold Project in Ontario. Assays include 2.56 g/t gold over 40 metres (including 3.26 g/t over 23 metres), 1.89 g/t over 46 metres (including 2.04 g/t over 29 metres), 3.79 g/t over 8 metres, 3.12 g/t over 22 metres and 4.17 g/t over 15 metres.

President/CEO André Tessier commented, “We’re very encouraged by these results. The gold zones are continuous and consistently mineralized. Our intercepts continue to be on average three times wider and at slightly better grades than those reported by Pamour in the early eighties. Drilling continues and we’re expecting more results very shortly.”

View Company Profile

André C. Tessier

by Ted Niles

Share |

View All: News Stories