Tuesday 27th September 2016

Resource Clips



Marathon, Mountain Lake report Nfld Gold Assays up to 3.15 g/t over 21.5m

Marathon Gold Corporation TSX:MOZ in joint venture Mountain Lake Resources Inc TSXV:MOA announced assays from the Leprechaun Gold Deposit in the Valentine Lake Property, Newfoundland. Results include 1.61 g/t gold over 3 metres, 1.4 g/t over 13 metres (including 4.45 g/t over 3 metres), 0.96 g/t over 3 metres, 3.45 g/t over 3.5 metres, 3.15 g/t over 21.5 metres (including 9.31 g/t over 2.5 metres). Each company holds 50% of the property and Marathon is the project operator.

Marathon President/CEO Phill Walford stated, “We are very pleased with our early 2011 drill results as this year’s exploration program continues to intersect new wide zones of moderate to locally high grade mineralization and should contribute significantly to our ongoing resource development effort.”

View Company Profile

Contact:
Terre Partners
Joanna Longo
President
416.238.1414

by Ted Niles

Share |

View All: News Stories