Saturday 1st October 2016

Resource Clips



Callinan reports Manitoba Assays up to 9.73 g/t gold over 5.8m

Callinan Mines Limited TSXV:CAA announced results from its Gossan Hill Property in Manitoba. Assays include 4.06 g/t gold over 4.53 metres (including 5.37 g/t over 2 metres), 1.72 g/t over 13.9 metres, 5.33 g/t over 2 metres (including 10.32 g/t over 0.8 metres), 4.61 g/t over 7.6 metres (including 9.81 g/t over 2.3 metres), 4.12 g/t over 2.3 metres, 9.73 g/t over 5.8 metres (including 30.3 g/t over 1.5 metres) and 8.26 g/t over 3.1 metres (including 13.53 g/t over 1.6 metres).

The Gurney Gold Mine, a historic mine on the Gossan Hill property, produced 25,164 ounces gold and 71,953 ounces silver between 1937 and 1939.

View Company Profile

Contact:
Callinan Mines Limited
604.605.0885

by Ted Niles

Share |

View All: News Stories