Saturday 22nd October 2016

Resource Clips

Salazar reports Ecuador Assays as high as 5.83 g/t Gold, 179.62 g/t Silver

SRL:CA announced assay results from its El Domo deposit at its Curipamba Project, Ecuador. Highlights include 5.83 g/t gold and 179.62 g/t silver over 8.85 metres, 5.5 g/t gold and 1.2 g/t silver over 6.04 metres and 2 g/t gold and 15.9 g/t silver over 4.5 metres.

President/CEO Fredy Salazar commented, “The recent results for the El Domo deposit demonstrate that significant copper, zinc and gold grades show continuity over a 450 m strike length and that the deposit remains open in all directions. Additional drilling is underway to further extend the limits of the deposit.”
View Company Profile

Investor Relations,

or 866.580.8891

by Ted Niles

Share |

View All: News Stories